Once we finally got the aluminum plates back from the machine shop, it was all hands on deck to assemble the ice rig frame. Here Hannah and I tighten the unistrut base and assemble the frame.
Next came the tie rods, middle supporting beams and the top aluminum plate. Had to make sure everything was level and lubed up.
A little while later, undergrad lab assistant Ben attached homemade brass bolts to which we will attach side plates (which the horizontal ram will need to push off of). He's hammering the top plate to get it in just the right position.