Although I was out on maternity leave for six months, the project did not sit dormant. I came back to big improvements to the ice rig. Ted installed all of the hydraulics (pipes running behind the rig, connecting to the two rams), including the servo amp electronics (green panel on front).
Check out the insane soldering work done by Heather on this Limits board.
Even more on the back side.